Projects We’ve Completed
Richmond I-89 Emergency Culvert Replacement
EIV provided construction inspection, office engineering and quality assurance for this emergency culvert replacement project located under the Southbound lanes of Interstate 89 just south of Exit 11 in Richmond,…
Burlington Greenway
EIV has provided resident engineering and material testing for this award-winning multi-use path along Burlington’s waterfront.
CityGardens
City Gardens is DagesseCo’s third boutique luxury apartment building located at 355 Main Street along Winooski’s Main Street District in Winooski, VT.
Terminal Integration Project
The Burlington International Airport Terminal Integration Project features a new terminal with a streamlined security checkpoint, expanded passenger seating and improved amenities, while greatly reducing BTV’s carbon footprint.
Springfield Bridge Replacements
Located along VT Route 11 between the towns of Chester and Springfield, VT this $3.4M bridge replacement project includes the removal and replacement of two separate bridges located approximately .7…
Woodford Ledge Removal
This $4M ledge removal project located on VT Route 9 in Woodford, VT involves a significant amount of ledge removal in order to improve safety and sightlines for the travelling…
Proctor North Street Bridge Replacement
EIV provided public outreach services on this bridge project which included the full replacement of the existing single-span rolled beam bridge with a new structural steel bridge with concrete deck…
Pittsford Route 7 Roadway Rebuild
This two-year $10.5M full-depth roadway reconstruction project is located in the town of Pittsford, VT is Segment 1 of six segments of the Pittsford-Brandon corridor reconstruction to bring the roadway…