Projects We’ve Completed
Rockingham I-91 Design-Build
This $44.5M bridge replacement project is located in the town of Rockingham on I-91 just north of Exit 6.
Middlebury Rail Tunnel
This $70+M tunnel project included the complete removal of two bridges in downtown Middlebury, VT and replacement with a new rail tunnel under Main Street.
Hinesburg/Route 116 Intersection
This intersection widening project is located at the intersection of Route 116, Shelburne Falls Road, and CVU Road in the town of Hinesburg, VT included widening on all approaches, guardrail…
Berlin Bridge Deck Replacement
This $6M bridge rehabilitation project includes the replacement of the concrete decks, approach slabs, and bridge and approach rail for four bridges on I-89 in the Town of Berlin, VT…
Hartland Depot Road Bridge Replacement
This $4.8M bridge project on Depot Road in Hartland, VT included the replacement of a six-span cast-in-place structure on rolled beams approximately 359 feet in length and 24 feet wide.
Cavendish-Weathersfield Roadway Reclaim
Located on VT Route 131 in Cavendish and Weathersfield, VT this $17M full-depth roadway reclaim project includes improvements to areas that sustained substantial damage as a result of Tropical Storm…
Parc Terrace
Parc Terrace is a 45-unit mixed income building with commercial space located at the corner of Manseau and East Allen Street in Winooski, VT.
Transmission Line Environmental Compliance Oversight
EIV has several environmental specialists who provide environmental compliance oversight services to transmission line and substation projects.