Projects We’ve Completed
Transmission Line Environmental Compliance Oversight
EIV has several environmental specialists who provide environmental compliance oversight services to transmission line and substation projects.
Main Street, Waterbury Roadway Reconstruction
Located on a 1.7 mile stretch of Main St. (VT-Route 2) in downtown Waterbury, Vermont, this project includes total roadway reconstruction, ductile iron public water supply, a gravity-fed sewer system,…
Bethel Route 12 Bridge Replacement
Located in Bethel, VT along Vermont Route 12, this $6.4M bridge project included replacing the existing bridge, constructed in 1928, with a new 364-foot-long bridge.
St. Johnsbury, VT Park and Ride Improvements
This $925K Park-and-Ride project located in the town of St. Johnsbury, VT at the intersection of U.S. Route 2 and Vermont Route 2B includes reconstruction of the existing lot, construction…
City Lofts
City Lofts is an upscale Boutique 25-unit apartment building with incredible attention to detail.
Bethel Bridge Replacement Route 12, Bridge 38
Located in Bethel, VT along Vermont Route 12, this $6.4M bridge project included replacing the existing bridge, constructed in 1928, with a new 364-foot-long bridge.
Great Streets Initiative: St. Paul Street Improvements
The first phase of the Great Streets Initiative in downtown Burlington, VT focused on the roadway reconstruction of St. Paul Street from Main Street/St. Paul Street intersection to a point…
Morrisville-Stowe Airport
The Morrisville-Stowe Runway Safety Area Project includes paving the Runway Safety Area (RSA) on both ends of the runway and the installation of a retaining wall.