This $20M roadway reconstruction project along an 8.2-mile segment of Route 2 between Richmond and Bolton, VT includes coarse-milling, concrete subsurface slab removal, repaving, guardrail, drainage improvements, culvert replacements, and…
EIV provided construction inspection, office engineering and quality assurance for this emergency culvert replacement project located under the Southbound lanes of Interstate 89 just south of Exit 11 in Richmond,…
The first of its kind in Vermont, the Oakledge Universally Accessible Playground will offer caregivers and their children full use of all areas, regardless of ability.
The Vermont Agency of Transportation (VTrans) has completed construction on Bridge 8 on U.S. 2 between the towns of North Hero and Grand Isle, Vermont.
This two-year $10.5M full-depth roadway reconstruction project is located in the town of Pittsford, VT is Segment 1 of six segments of the Pittsford-Brandon corridor reconstruction to bring the roadway…
AMTRAK’s Ethan Allen Express began service in July of 2022, connecting travellers from NYC to Burlington, VT in under eight hours with expanded service including five stops in Vermont.
This intersection widening project is located at the intersection of Route 116, Shelburne Falls Road, and CVU Road in the town of Hinesburg, VT included widening on all approaches, guardrail…
Located on a 1.7 mile stretch of Main St. (VT-Route 2) in downtown Waterbury, Vermont, this project includes total roadway reconstruction, ductile iron public water supply, a gravity-fed sewer system,…
This $6M bridge rehabilitation project includes the replacement of the concrete decks, approach slabs, and bridge and approach rail for four bridges on I-89 in the Town of Berlin, VT…
This $4.8M bridge project on Depot Road in Hartland, VT included the replacement of a six-span cast-in-place structure on rolled beams approximately 359 feet in length and 24 feet wide.
This $70+M tunnel project included the complete removal of two bridges in downtown Middlebury, VT and replacement with a new rail tunnel under Main Street.
This $14.5M project includes the deck replacement of four three-span bridges (Bridges 76N and 76S spanning Bay Rd., and Bridges 77N and 77S spanning Mallett’s Creek) on I-89 between Exit…
EIV provided public relations, office engineering and construction inspection services for this $10.5M, 7.5 mile stretch of roadway along Vermont Route 73 in the towns of Brandon and Goshen, VT.
The Vermont Agency of Transportation (VTrans) has completed construction on Bridge 8 on U.S. 2 between the towns of North Hero and Grand Isle, Vermont.
EIV is provided environmental inspection, office engineering and project outreach services on this $7.8M roadway reconstruction project located along a 1.4-mile segment of Route 2 in Cabot, VT.
Located on the west side of Routes 2 & 7 in Colchester VT, construction activities on this $1M project included installation of new traffic signals, electric vehicle charging stations, a…
Project Overview: The Vermont Agency of Transportation contracted EIV to oversee Quality Management, Construction Inspection and Materials Testing for the Hartford I-91 bridge replacement project.
EIV was contracted to oversee and manage a portion of the emergency repair of one of the largest railroad bridges in Vermont, a 450-foot through-girder railroad bridge on the Vermont…