EIV provides arborist consultation and landscape inspection services for multiple transportation and infrastructure projects throughout the state of Vermont.
EIV is currently providing environmental oversight services for the construction of the new manufacturing plant for BETA Technologies located at the Burlington International Airport.
This two-year $10.5M full-depth roadway reconstruction project is located in the town of Pittsford, VT is Segment 1 of six segments of the Pittsford-Brandon corridor reconstruction to bring the roadway…
The Burlington International Airport Terminal Integration Project features a new terminal with a streamlined security checkpoint, expanded passenger seating and improved amenities, while greatly reducing BTV’s carbon footprint.
Located in Bethel, VT along Vermont Route 12, this $6.4M bridge project included replacing the existing bridge, constructed in 1928, with a new 364-foot-long bridge.
Located in Bethel, VT along Vermont Route 12, this $6.4M bridge project included replacing the existing bridge, constructed in 1928, with a new 364-foot-long bridge.
The Morrisville-Stowe Runway Safety Area Project includes paving the Runway Safety Area (RSA) on both ends of the runway and the installation of a retaining wall.
VELCO owns, operates and maintains Vermont’s high-voltage electric transmission system. VELCO’s New Haven Operations Facility was designed and constructed to meet national and regional reliability standards and will serve as…
EIV is provided environmental inspection, office engineering and project outreach services on this $7.8M roadway reconstruction project located along a 1.4-mile segment of Route 2 in Cabot, VT.