The Vermont Agency of Transportation (VTrans) has completed construction on Bridge 8 on U.S. 2 between the towns of North Hero and Grand Isle, Vermont.
AMTRAK’s Ethan Allen Express began service in July of 2022, connecting travellers from NYC to Burlington, VT in under eight hours with expanded service including five stops in Vermont.
Located along VT Route 11 between the towns of Chester and Springfield, VT this $3.4M bridge replacement project includes the removal and replacement of two separate bridges located approximately .7…
This $4M ledge removal project located on VT Route 9 in Woodford, VT involves a significant amount of ledge removal in order to improve safety and sightlines for the travelling…
EIV provided public outreach services on this bridge project which included the full replacement of the existing single-span rolled beam bridge with a new structural steel bridge with concrete deck…
This two-year $10.5M full-depth roadway reconstruction project is located in the town of Pittsford, VT is Segment 1 of six segments of the Pittsford-Brandon corridor reconstruction to bring the roadway…
This $4.8M bridge project on Depot Road in Hartland, VT included the replacement of a six-span cast-in-place structure on rolled beams approximately 359 feet in length and 24 feet wide.
This $6M bridge rehabilitation project includes the replacement of the concrete decks, approach slabs, and bridge and approach rail for four bridges on I-89 in the Town of Berlin, VT…
This intersection widening project is located at the intersection of Route 116, Shelburne Falls Road, and CVU Road in the town of Hinesburg, VT included widening on all approaches, guardrail…
Located on VT Route 131 in Cavendish and Weathersfield, VT this $17M full-depth roadway reclaim project includes improvements to areas that sustained substantial damage as a result of Tropical Storm…
Located in Bethel, VT along Vermont Route 12, this $6.4M bridge project included replacing the existing bridge, constructed in 1928, with a new 364-foot-long bridge.
This $925K Park-and-Ride project located in the town of St. Johnsbury, VT at the intersection of U.S. Route 2 and Vermont Route 2B includes reconstruction of the existing lot, construction…
Located in Bethel, VT along Vermont Route 12, this $6.4M bridge project included replacing the existing bridge, constructed in 1928, with a new 364-foot-long bridge.
EIV provided public relations, office engineering and construction inspection services for this $10.5M, 7.5 mile stretch of roadway along Vermont Route 73 in the towns of Brandon and Goshen, VT.
EIV provided outreach services on this $13M, 9-mile long roadway project which included reclaiming the existing roadway, paving with an intermediate and leveling course, limited areas of new curb installation…
The Vermont Agency of Transportation (VTrans) has completed construction on Bridge 8 on U.S. 2 between the towns of North Hero and Grand Isle, Vermont.
EIV is provided environmental inspection, office engineering and project outreach services on this $7.8M roadway reconstruction project located along a 1.4-mile segment of Route 2 in Cabot, VT.